Highway 12 on-ramp to be closed Tuesday

The on-ramp at the highways 12 and 50 interchange will close at 7 a.m. Tuesday and re-open around 8 p.m.

The closure was previously scheduled to take place Monday but the paving contractor’s asphalt producing plant broke down, putting crews a day behind schedule.

Beginning at 7 a.m., the Wisconsin Department of Transportation is scheduled to close the entrance ramp from Highway 50 to westbound Highway 12. The closure is expected to last until 8 p.m.

The detour for westbound Highway 50 motorists will be:

  • Proceed through the highways 12 and 50 interchange to access Edwards Boulevard;
  • Go north on Edwards Boulevard, continuing as it turns into Sheridan Springs Road;
  • Continue west on Sheridan Springs Road to County Road H;
  • Go east on County Road H to access the Highway 12 westbound on-ramp at the Highway 120 interchange.

The closure is needed to complete asphalt paving where the ramp matches into Highway 12 westbound.

More information about the project can be found on 511 Wisconsin at projects.511wi.gov/us12wis50/.

Comments are closed.